日韩av高清视频在线观看欧美日韩成人在线视频|成年女人午夜特黄特色毛片免|国产女人毛片18女人毛片|大陆乱理伦片在线观看|强行糟蹋人妻系列电影|中文字幕熟女日韩人妻|熟妇女人妻丰满|白嫩少妇高潮喷水在线观看|乱情家族我的纯情岳母|荫道bbwbbb高潮潮喷,巨乳人人妻,91超碰在线人妻,少妇大保健高潮


Chinese

ENGLISH

Contact Us

河北興盛塑料管業(yè)有限公司

Website     :studiots.cn

Contact     :Manager Zhang

Phone       :13933323655

Mail          :[email protected]

Buy online:https://shop377465757.taobao.com/

Common problem Common-problem
The connecting process of PE pipe is analyzed
Hot melt connection is a PE water supply pipe connection. Generally, it is suitable for connecting pipe fittings with small diameter, small section and thin pipe wall (the common diameter is below DN63mm), which has the advantages of simple connection, long service life and not easy to corrode. The following is a brief introduction of the main steps of hot-melt connection construction process:
 
 
 
 
 
1. Material preparation: place the pipe or fittings in a flat position on the docking machine, leaving a cutting margin of 10-20mm.
 
 
 
 
 
 
 
2. Clamping: Select appropriate clamps according to welded pipes and fittings, clamp pipes and prepare for cutting.
 
 
 
 
 
 
 
3. Cutting: Cutting impurities and oxide layer of welded pipe segment and pipe fitting end face to ensure that the butt end face is smooth, smooth and free of impurities.
 
 
 
 
 
 
 
4. Centering: The end face of the two welded pipe segments should be completely aligning. The smaller the wrong side is, the better; the wrong side should not exceed 10% of the wall thickness. Otherwise, it will affect the butt quality.
 
 
 
 
 
 
 
5. Heating: The butt joint temperature is generally between 210-230℃. The heating time of the heating plate is different in summer and winter.
 
 
 
 
 
 
 
6. Switching: Remove the heating plate and quickly make the two thermal melting end faces stick and pressurize. In order to ensure the quality of melting butt, the shorter the switching period, the better.
 
 
 
 
 
 
 
7. Fusion butt joint: it is the key to welding. The butt joint process should always be under the melting pressure.
 
 
 
 
 
 
 
8. Cooling: Keep the butt joint pressure unchanged, and let the interface cool slowly. The cooling time shall be determined by touching the curling edge and not feeling the heat.
 
 
 
 
 
 
 
9. Docking completion: release the slips after cooling, remove the docking machine, and prepare for the next connection.
 

  • Official Website

  • Taobao Shop

  • Wechat Account